The new UPS is installed and requires a run time test. This takes place Monday, January 27th, 2025, 08:00 - 12:00. A downtime of this service might occur.

PI

Master Colloquium: Study of TID Radiation Effects and Characterization of the ITkPixV2 Readout Chip for the ATLAS ITk Pixel Detector Upgrade

by Konstantin Mauer

Europe/Berlin
Kreuzbergweg 24/2.010 (FTD) - Besprechungsraum 2. OG (FTD)

Kreuzbergweg 24/2.010 (FTD) - Besprechungsraum 2. OG

FTD

15
Show room on map